Design of Initial Mining Pressure Relief Scheme for Large‐Size Mining Face: A Case Study

Read full text Summarise with VIRAT
Authors: Qinghu Wei, Ming Nan Ji, Biao Huang, Kang Guo
Cited by: 0
References: 24

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

ABSTRACT In this paper, a mining face of a mine in Pubai Huangling County serves as the study object. Use the numerical modeling analysis approach to compare the actual mining face (315 m) with the designed mining face (200 m). The results show that the large‐size mining face has a larger peak abutment pressure and a larger stress concentration factor than the general‐size mining face. The initial mining of large‐size working face causes large displacement of roof, floor, and two sides. To tackle the intensified pressure from the expanded mining face, we developed a hydraulic fracturing pressure management plan. This plan was crafted through meticulous theoretical studies and computational models, and it has since undergone rigorous field testing.

Fields of Study & Subjects

Geomechanics and Mining Engineering Geoscience and Mining Technology Rock Mechanics and Modeling

Publication details

Journal / source
Engineering Reports
Volume
8
Issue
4
Publication date
25 March 2026
Language
EN