Vienna Valley Relief Channel – WSKE West

Read full text
Authors: Nikolaus Hödlmoser, Jakob Friess, Silvia Deutinger
Cited by: 0

Abstract

In order to adapt Vienna's wastewater disposal system to the growing demands of the population and to ensure the protection of the Vienna River (Wienfluss), a new relief channel is being built along the western Vienna Valley – the Wientalsammelkanal‐Entlaster (WSKE) West. The hydraulic objective of this structure is to relieve the Vienna River by reducing sewer discharges during heavy rainfall events. In addition, this will enable maintenance work to be carried out on the existing sewer system. The WSKE West crosses three geological zones and, due to varying subsoil conditions, places different demands on construction methods and procedures. The channel is being constructed in the vicinity of the Vienna River using a tunnel with a closed construction method with an internal diameter of 3.00 m. The collection channels on the left and right banks of the Vienna River are connected to the WSKE West via some 40 overflow chambers, so that overflowing mixed water is discharged into the new channel.

Fields of Study & Subjects

Tunneling and Rock Mechanics Geotechnical Engineering and Underground Structures Geotechnical Engineering and Analysis

Publication details

Journal / source
Geomechanics and Tunnelling
Volume
19
Issue
1
Pages
94–108
Publication date
28 January 2026
Language
PL