Root Cause Analysis and Improvement Measures for the Plunger Assembly Failures in the Emergency Boric Acid Injection Pump in Nuclear Power Plant
Summary
No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.
Summarise with VIRAT Free to try with your Science Catalogs account.Fields of Study & Subjects
Mechanical Failure Analysis and Simulation
Nuclear and radioactivity studies
Engineering Diagnostics and Reliability
Publication details
- Journal / source
- Springer proceedings in physics
- Pages
- 455–469
- Publication date
- 1 April 2026
- Language
- EN