A preemptive single-machine scheduling problem with a late work criterion and convex resource consumption functions

Read full text
Authors: Byung‐Cheon Choi, Myoung‐Ju Park
Cited by: 0
References: 23

Abstract

Abstract We consider two single-machine scheduling problems with the late work criterion, where each job’s processing time follows a decreasing convex function of the resource consumption amount, and each job can be interrupted and resumed later. The first objective is to minimize the sum of late work and resource consumption amount, while the second objective is to minimize the total late work with a constraint on the total resource consumption amount. We show that both problems can be solved in strongly polynomial time.

Fields of Study & Subjects

Scheduling and Optimization Algorithms Resource-Constrained Project Scheduling Real-Time Systems Scheduling

Publication details

Journal / source
Optimization Letters
Volume
20
Issue
5
Pages
1025–1042
Publication date
4 February 2026
Language
EN