Multi-objective ergonomic–economic project scheduling in construction: The case of photovoltaic system installation

Read full text
Authors: Jannis David, Thomas Völling
Cited by: 0
References: 37

Abstract

The prevalence of work-related musculoskeletal disorders (WMSD) poses a significant challenge for construction companies. These disorders cause severe physical distress for affected workers, as well as reduced productivity, increased absenteeism, and escalating healthcare costs. The situation is exacerbated by ongoing labour shortages and shifting workforce demographics. To address this issue, we present a novel multi-objective decision support framework designed to optimise construction projects both ergonomically and economically. The proposed Bi-MRCPSP expands upon the multi-mode resource-constrained project scheduling problem (MRCPSP) by additionally incorporating worker equipment modes. We consider three objectives: (1) project duration, (2) resource availability cost, and (3) workers’ energy expenditure. Within this framework, three ergonomic interventions are integrated: (1) additional workforce, (2) planned recovery breaks, and (3) the use of exoskeletons. Applying the model to the installation of photovoltaic (PV) systems in residential homes demonstrates its validity and ability to support decision-making for the selection and implementation of interventions. A key finding is that exoskeletons enable more time- and cost-efficient ergonomic workplace designs, encouraging both companies and researchers to explore this technology further.

Fields of Study & Subjects

Resource-Constrained Project Scheduling Construction Project Management and Performance Occupational Health and Safety Management

Publication details

Journal / source
Computers & Industrial Engineering
Volume
213
Pages
111828–111828
Publication date
14 January 2026
Language
EN