Production and quality control of calcined clay for cementitious applications

Read full text
Authors: Guangtong Huang, Yue Liu, Tom Benn, Jinzhou Su, Yan Zhuge
Cited by: 1
References: 63

Abstract

The growing demand for low-carbon alternatives in cement production has brought calcined clays—particularly kaolinitic clays—into focus as promising supplementary cementitious materials (SCMs). This review critically examines the production, characterisation, and quality control of calcined clays with emphasis on their reactivity and performance in cementitious systems. The paper identifies key challenges in ensuring consistent quality of calcined clays, including the inherent variability of natural clay sources, sensitivity to calcination parameters, and the lack of rapid, reliable quality control tools. A comprehensive dual-stage framework is proposed to address both pre- and post-calcination quality control. Pre-calcination methods such as X-ray diffraction (XRD), X-ray fluorescence (XRF), thermogravimetric analysis (TGA), and Fourier-transform infrared spectroscopy (FTIR) are recommended for assessing clay mineralogy, chemical composition, and structural suitability. Post-calcination techniques—ranging from isothermal calorimetry (R3 method) and methylene blue absorption to solid-state NMR and electrical conductivity measurements—are evaluated for their ability to distinguish among under-, optimally-, and over-calcined clays. The study consolidates these approaches into a practical quality control framework for industrial deployment. This integrated strategy ensures effective activation and utilisation of calcined clays, thereby enabling consistent performance and maximising the carbon-reduction potential of SCM-based cement systems.

Fields of Study & Subjects

Concrete and Cement Materials Research Innovations in Concrete and Construction Materials Innovative concrete reinforcement materials

Publication details

Journal / source
Structures
Publisher
Elsevier BV
Volume
88
Pages
111851–111851
Publication date
13 April 2026
Language
EN