Improved GA-based scheduling of a flexible job shop for large components considering the interference between multiple cranes

View at publisher
Authors: Jiayu Pan, Dong Wang, Liping Wang, Xuekun Li
Cited by: 2
References: 39

Fields of Study & Subjects

Scheduling and Optimization Algorithms Advanced Manufacturing and Logistics Optimization Flexible and Reconfigurable Manufacturing Systems

Publication details

Journal / source
Journal of Manufacturing Systems
Publisher
Elsevier BV
Volume
86
Pages
120–140
Publication date
12 March 2026
Language
EN