Revisiting Johnson’s rule for minimizing makespan in the two-machine flow shop scheduling problem
Abstract
We consider Johnson’s rule for minimizing the makespan in the two-machine flow shop problem. We show that it is possible to detect in linear time whether a full sorting of jobs can be avoided and an optimal solution can be computed in O(n) time. A probabilistic analysis indicates that linear-time complexity holds with high probability under uniformly distributed processing times, a result further supported by extensive computational experimentation.
Fields of Study & Subjects
Scheduling and Optimization Algorithms
Optimization and Search Problems
Optimization and Packing Problems
Publication details
- Journal / source
- Operations Research Letters
- Publisher
- Elsevier BV
- Volume
- 69
- Pages
- 107514–107514
- Publication date
- 13 August 2026
- Language
- EN