Forecasting and scheduling of railway rake

View at publisher
Authors: Sushma Nagdeote, Sujata Chiwande, Pradyumnaa Kadam, Rahul Gandla, Soham Khochare
Cited by: 0

Abstract

Coal transportation through railway rakes is essential to industry supply chains, but inefficient loading and unloading processes can lead to severe delays and expensive demurrage. By introducing a system to forecast and schedule railway rakes at coal terminals, this project seeks to eradicate such inefficiencies. The system will forecast key variables like rake arrival times, coal stocks, and site handling capacity from real-time inputs, predictive data, and sophisticated algorithms. Proactive decisions to avoid delays will be enabled. Real-time rake assignment will be optimized by a dynamic scheduling framework based on site constraints, dispatch priority, and rake type. This ensures better operations and less idle time. Next.js will be utilized in the system development to offer a scalable, efficient, and responsive web-based interface to handle forecasting and scheduling. Decreased rake turnaround time, increased throughput capacity, and a significant reduction in demurrage cost are the anticipated outcomes. This project promotes cost savings and more sustainable logistics management in the coal industry eradicating such inefficiencies.

Fields of Study & Subjects

Transport and Logistics Innovations Maritime Ports and Logistics Railway Systems and Energy Efficiency

Publication details

Journal / source
IET conference proceedings.
Volume
2025
Issue
43
Pages
619–624
Publication date
1 February 2026
Language
EN