System for planning and risk management of the life cycle of nuclear construction facilities

View at publisher Summarise with VIRAT
Authors: Gusev Yuri Sergeevich
Cited by: 0
References: 8

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The work describes the full life cycle of the most costly phases of nuclear energy facilities until commissioning and the financial and economic indicators of the entire life cycle. The most popular contract model and its features in the implementation of large technically complex projects abroad are considered using the example of the construction of a center for nuclear research and technology (hereinafter referred to as CNRT) in the Plurinational State of Bolivia. Approaches to implementing changes that arise at various stages (phases) of the project are described. A basic organizational diagram of the relationships between participants in the CNIT project is presented. The work proposes three approaches to the planning system and details it in the planning system at the stage of defining and selecting a contract model. Using the example of the equipment supply process from the moment of design to commissioning, the process was broken down into main subprocesses with an estimated duration and risks, and an option was proposed for planning and selecting the entry point into the process, taking into account the risk events that arise in each subprocess. A comparison is made of the main advantages and disadvantages of various planning approaches.

Fields of Study & Subjects

Construction Project Management and Performance Capital Investment and Risk Analysis Construction Management and Sustainability