Release date optimisation in MRP using clearing functions

Read full text
Authors: Wolfgang Seiringer, Klaus Altendorfer, Reha Uzsoy
Cited by: 2
References: 80

Abstract

This paper integrates a clearing function (CF)-based release planning approach into Material Requirements Planning (MRP) to address its limitations in modelling capacity constraints and dynamic lead times. The proposed optimisation model replaces MRP’s backward scheduling step while preserving its overall structure. Performance is evaluated through simulation experiments on two flow shop systems that explore a range of demand uncertainties and utilisation levels. Computational results show that the proposed approach is capable of yielding significant improvements over the conventional backward scheduling approach, due to its ability to compute planned lead times for individual production orders as opposed to BOM items.

Fields of Study & Subjects

Constraint Satisfaction and Optimization DNA and Biological Computing Advanced Database Systems and Queries

Publication details

Journal / source
International Journal of Production Research
Publisher
Informa UK Limited
Volume
64
Issue
15
Pages
6695–6720
Publication date
5 February 2026
Language
EN