Grid-integrated green ammonia production system design optimisation under renewable energy supply uncertainty

View at publisher
Authors: Andrew Swift, Hamid Afshari, Ahmed Saif, Claver Diallo
Cited by: 1
References: 48

Abstract

Green hydrogen (GH) and green ammonia (GA) are promising solutions for decarbonising hard-to-abate sectors and enabling large-scale renewable energy storage and transportation. As interest in GH increases, optimising production facilities facing intermittent renewable energy supply is essential for economic viability. Existing studies often oversimplify uncertainty in scenario probabilities for renewable generation and ignore interactions with electricity markets. To address this gap, this study develops a stochastic optimisation framework for designing grid-connected GH–GA systems and extends it to a distributionally robust optimisation formulation to hedge against ambiguity in those scenario probabilities. Market participation is captured through a pay-as-cleared electricity market mechanism. A hyperparameter calibration for scenario count and divergence budget validated through out-of-sample testing shows improved reliability compared to conventional stochastic methods. A case study on Canada's Eastern coast identifies a hybrid wind-solar system with grid backup a cost-effective configuration, achieving hydrogen and ammonia costs of $4.17/kg and $0.72/kg, respectively. Sensitivity analyses show that rising electricity prices favour increased on-site wind capacity and reduced grid reliance. Results highlight that optimal system design and market strategies are region-specific, project economics remain stable across wide ranges of market pricing and grid accessibility, and accounting for uncertainty improves economic performance and production stability.

Fields of Study & Subjects

Ammonia Synthesis and Nitrogen Reduction Hybrid Renewable Energy Systems Carbon Dioxide Capture Technologies

Publication details

Journal / source
International Journal of Production Research
Publisher
Informa UK Limited
Pages
1–33
Publication date
6 August 2026
Language
EN