Fixed time bipartite consensus tracking for nonlinear multiagent systems under structurally unbalanced topologies: an incremental adaptive control approach

View at publisher Summarise with VIRAT
Authors: Xin Jin, Jiuxiang Dong
Cited by: 0
References: 42

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

This article investigates the fuzzy incremental adaptive fixed time bipartite consensus tracking control problem for nonlinear multiagent systems under structurally unbalanced directed graphs. By combining an agent hierarchical algorithm, bipartite consensus control can be achieved even in structurally imbalanced directed topologies, thereby effectively relaxing the stringent requirements on network topology. Then, an incremental adaptive fixed time control scheme is developed by combining backstepping techniques with fixed time control methods. This scheme can serve as an extension of traditional integral adaptive methods, maintaining control performance while avoiding the complexity of numerical integration during execution. Furthermore, an adaptive switching function is designed to resolve the singularity issue present in fixed time control. Stability analysis demonstrates that the formulated control strategy ensures the boundedness of all variables in the multiagent system and achieves bipartite consensus tracking control within a fixed time. Finally, numerical examples demonstrate the practicability of the developed consensus control scheme.

Fields of Study & Subjects

Distributed Control Multi-Agent Systems Neural Networks Stability and Synchronization Adaptive Control of Nonlinear Systems

Publication details

Journal / source
International Journal of Systems Science
Pages
1–14
Publication date
26 March 2026
Language
EN