Research on Optimization of SCV–TB Assembling Process and Control Technology of Top Plate Leveling on RCB in CAP1400 Nuclear Power Plant

View at publisher Summarise with VIRAT
Authors: Angang Yan, Minglu Gao, Qianjian Guo, Xiaobo Hu, Wei Yuan, Jiandang Hong, Qingqing Chang
Cited by: 0
References: 32

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

A steel containment vessel (SCV) is a critical safety feature of a nuclear power plant reactor facility. It plays a pivotal role in preventing the leakage of radioactive material and resisting physical shock. It directly impacts the construction efficiency and structural stability of SCV, making it a pivotal piece of equipment in the nuclear engineering industry. As a critical component in the construction and operation of nuclear power plants, the lifting capacity of the equipment in question is directly related to the construction efficiency and structural stability of the SCV. This study proposes a novel SCV design for the CAP1400 nuclear power plant. The tubing body (TB) plate assembly technology is optimized, and a new modular construction method for the ring crane beam (RCB) is proposed. A comprehensive investigation was conducted into the influence of multiple factors on the level of the top plate on the RCB during the welding process. This investigation involved the optimization of the traditional single-beam welding process and the analysis of the amount of welding deformation. The findings indicate that localized and uneven heating during the welding process is the primary cause of welding stress and deformation concentration. Wave deformation, bending deformation, angular deformation, welding shrinkage, and welding sequence are identified as the key factors affecting the amount of welding deformation of the top plate on the crane girder. The implementation of an RCB mounting support, gap adjustment device, and angular deformation control device and the optimization of welding sequences have been demonstrated to effectively regulate the deformation that occurs during the welding process. Furthermore, the optimized SCV–TB assembly technology has the capacity to concurrently assemble 12 bodies, thereby markedly enhancing the installation efficiency. This study has the potential to furnish specific technical references that may be instrumental in the subsequent assembly of SCV inner wall RCB structures in large nuclear power plants.

Fields of Study & Subjects

Welding Techniques and Residual Stresses Nuclear and radioactivity studies Manufacturing Process and Optimization

Publication details

Journal / source
Nuclear Technology
Pages
1–15
Publication date
25 March 2026
Language
EN