Enhancing construction site layout planning using hybrid Ant Colony and simulated annealing algorithms

Read full text Summarise with VIRAT
Authors: Mona Salah, Ibrahim A. Motawa, Mohamed T. Elnabwy
Cited by: 0
References: 45

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Effective construction site layout planning (CSLP) is critical for enhancing logistics efficiency, safety, and space utilization in complex construction environments. In practice, planners must evaluate multiple layout alternatives under spatial, operational, and safety constraints within limited decision time. However, traditional optimization approaches often struggle with the nonlinear and constraint-rich nature of real construction sites, either requiring excessive computational time or compromising solution quality. To address these challenges, this study proposes a hybrid metaheuristic framework that integrates Ant Colony Optimization (ACO) with Simulated Annealing (SA) to support CSLP decision-making. The approach leverages the global search capability of ACO and the local refinement strength of SA to generate high-quality layout solutions with improved computational efficiency. The hybrid mechanism employs adaptive pheromone updating alongside local search enhancement to balance exploration and exploitation effectively. The framework is validated through application cases, including a benchmark problem and a large-scale multi-building construction site. Results demonstrate that the proposed method achieves up to a 95% reduction in computational time compared with standalone approaches, while maintaining or improving solution quality. Beyond algorithmic performance, the study offers managerial value by enabling structured comparison of layout alternatives and supporting data-driven decision-making.

Fields of Study & Subjects

Metaheuristic Optimization Algorithms Research BIM and Construction Integration Advanced Manufacturing and Logistics Optimization

Publication details

Journal / source
Construction Management and Economics
Volume
44
Issue
5
Pages
381–396
Publication date
26 March 2026
Language
EN