Simultaneous stochastic optimisation of mining complexes: integrating waste management and progressive reclamation with encapsulation
Abstract
Effective waste rock management is crucial for long-term mining planning. Ignoring the role of potentially acid-generating (PAG) waste rock requires significant treatment costs incurred to mitigate acid rock drainage (ARD). Encapsulation of PAG material can prevent or mitigate ARD by limiting exposure. Traditional practices don’t optimise production schedules while addressing this risk. This work integrates waste management and reclamation using encapsulation into a simultaneous stochastic optimisation framework. Uncertainties in acid generation are addressed using geostatistical simulations of the rock’s geochemical properties. A case study at a copper-gold mining complex increases the encapsulation by 41.3% with 1.6% decrease in NPV.
Fields of Study & Subjects
Mine drainage and remediation techniques
Mining Techniques and Economics
Tailings Management and Properties
Publication details
- Journal / source
- International Journal of Mining Reclamation and Environment
- Publisher
- Informa UK Limited
- Pages
- 1–14
- Publication date
- 14 April 2026
- Language
- EN