Optimizing open-pit design for ore and ferronickel sales schemes: Economic and environmental considerations from a nickel laterite mine in Southeast Sulawesi, Indonesia

View at publisher Summarise with VIRAT
Authors: M. R. A. Muzhidin, Tri Karian
Cited by: 0
References: 4

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

This study evaluated the optimization of open-pit design at a nickel mining site. Two sales schemes were assessed: direct nickel ore sales and processed ferronickel sales. The Lerchs-Grossman algorithm was implemented. Technical and economic parameters, stripping ratio, selling price, and mining costs were used to evaluate the net value and reserve distribution. The ore sales scheme yielded 2.4 times more reserves than the ferronickel scheme; however, the ferronickel scheme produced a net value that was 1.9 times higher, as the ferronickel scheme had a higher nickel (Ni) content.

Fields of Study & Subjects

Mining Techniques and Economics Engineering and Environmental Studies Geomechanics and Mining Engineering

Publication details

Journal / source
CIM Journal
Volume
17
Issue
2
Pages
94–99
Publication date
25 March 2026
Language
EN