+73 more A. Nelson, S. Abouelazayem, А. И. Алиева, T. Anderson, J. Benayas, L. Black, Marcus Borscz, Matthew Bristow, S. Brown, P. Bunting, A. Burchill, K. Chandrasekhar, P. Cheema, O. Danisworo, A. Yu. Dnestrovskij, A V Dudkovskaia, J. England, J. Fowler, V. Godhani, E. Guise, S. Irukuvarghula, D. James, F. Janky, G.S. Kamal, Jisung Kang, M. Kruip, Abhishek Kumar, Vivian Y.S. Lee, Samara M. Levine, J. Lima, Nicolas Lopez, I. Loughran, F. Malinowski, C. Marsden, L. Mateescu, A.F.P. McAdam, S. Yu. Medvedev, M. Michalopoulou, M.K.E. Mohamed, J. Naish, G. Naylor, D. O’Dea, J. Pickles, R. Pocock, Matthew Robinson, M. Romanelli, S. Romanelli, A. Scarabosio, M. Scarpari, A. Scott, Andrew Shone, A. Sladkomedova, A. Soldatova, T. Srawley, J. Stirling, G. Stoneham, R. Suhardjo, Y. Takase, J. Taylor, S. Terry, R. Thwaites, J. Trueba, B. van Nugteren, J. Varje, E. O. Vekshina, Benjamin Vincent, Anatoliy Vorobev, A.L. Washington II, N. Welch, A. Whitehead, M. Whitfield, E. Wooldridge, M.J. Ginsberg
Cited by: 9
References: 40

Abstract

Abstract Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $ 12–14k/kW of net electric power, and high availability (targeting > 80 % ). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

Fields of Study & Subjects

Magnetic confinement fusion research Fusion materials and technologies Superconducting Materials and Applications

Publication details

Journal / source
Nuclear Fusion
Publisher
IOP Publishing
Volume
66
Issue
8
Pages
086001–086001
Publication date
10 July 2026
Language
EN