Automatic generation algorithm for future-state startup wiring diagrams of power grids based on topological link search

Read full text Summarise with VIRAT
Authors: Yi Liu, Yanqiang Shi, Jianpeng Sun
Cited by: 0
References: 5

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Abstract To address the issue of inefficient line resource utilization in future grid configurations caused by excessive focus on dynamic investment costs, this study proposes an automatic generation algorithm for startup connection diagrams based on topological link search. By preprocessing anomaly information through topological link search, a spatiotemporal dual-dimensional constraint model is constructed for precise mapping. A dual-dimensional cost evaluation model integrating dynamic investment and anomaly operation is established. An improved force-directed layout algorithm is designed with the objective of minimizing the total annual cost per unit load. Coupling the cost field with the force field enables the transition from economic optimization to graphical layout. Experimental results demonstrate that the generated wiring diagrams cover over 95% of critical equipment lines, limit junction points to 25, achieve a connection density of 0.23 at a node degree of 10, and maintain line redundancy at only 0.25 during main transformer operation. This study achieves automated generation and optimization of future-state grid wiring diagrams, providing a novel solution for smart grid planning that balances economic efficiency and reliability.

Fields of Study & Subjects

Smart Grid and Power Systems Electric Power System Optimization Optimal Power Flow Distribution

Publication details

Journal / source
Journal of Physics Conference Series
Volume
3192
Issue
1
Pages
012006–012006
Publication date
1 March 2026
Language
EN