Expedited desalination permitting enables adaptive planning and water system cost reduction

Read full text
Authors: Marta Zaniolo, Sarah Marie Fletcher, Meagan S. Mauter
Cited by: 0
References: 20

Abstract

Abstract Seawater desalination is a drought-proof water supply for coastal cities, but widespread development of desalination plants in the U.S. has been limited by both cost and the complexity of permitting processes designed to minimize environmental impact. This work estimates the value of accelerating the permitting timeline without changing environmental or social standards. On average, faster permitting reduces the frequency of desalination plant construction and operation, the overall costs of robust water system operation, the environmental impacts of drought-tolerant water supplies due to shorter duration of plant operation. Expedited permitting allows fundamental changes in how water infrastructure is deployed, facilitating a transition from anticipatory construction and continuous operation of seawater desalination capacity as a redundant drought buffer to just-in-time (i.e. adaptive) deployment of seawater desalination capacity when critical drought thresholds are crossed. We demonstrate the value of expedited desalination permitting in enabling adaptive planning and reducing water system costs using a simple case study in Santa Barbara, CA. We discuss additional forms of adaptive water infrastructure planning as enabled by faster permitting and address their challenges and opportunities. Lastly, we identify synergies between innovation in adaptive planning, innovation in expedited permitting practices, and innovation in water technology.

Fields of Study & Subjects

Water resources management and optimization Water-Energy-Food Nexus Studies Environmental Science and Water Management

Publication details

Journal / source
Environmental Research Infrastructure and Sustainability
Volume
6
Issue
1
Pages
011002–011002
Publication date
27 January 2026
Language
EN