Quality Management

View at publisher Summarise with VIRAT
Authors: Andrea Post Rae
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

This chapter explains the process of notifying Defects, correcting Defects within the defect correction period, the consequences if the Contractor fails to correct a Defect and how and why Defects may be accepted by the Project Manager without correction. It sets out the Supervisor's right to instruct the Contractor to search for a Defect and what happens if a Defect is or is not found. It also explains the significance of the defects date, who issues the Defects Certificate and when it is issued. It describes the process for notifying and carrying out tests and inspections and the consequences if the Supervisor or the Contractor fail to follow the process.

Fields of Study & Subjects

Construction Project Management and Performance Construction Engineering and Safety Civil and Structural Engineering Research

Publication details

Journal / source
Emerald Group Publishing Limited eBooks
Pages
25–29
Publication date
25 March 2026
Language
EN
Document type
Book chapter