Calculation Framework of Provincial Power Grid Investment Capacity and Analysis of “15th Five Year Plan” Scenario
Summary
No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.
Summarise with VIRAT Free to try with your Science Catalogs account.Abstract
In the construction process of the new power system, provincial power grids face multiple constraints such as 'supply guarantee, transformation, and price stability'. The investment scale needs to be controllable and recoverable within the framework of transmission and distribution price supervision. This article is based on the pricing mechanism of provincial power grid transmission and distribution electricity prices and establishes the relationship between 'permitted income, transmission and distribution electricity quantity, transmission and distribution electricity price' and 'investment, depreciation, effective assets, permitted income'. It proposes a model for calculating investment capacity that considers stable price goals, constraints on investment efficiency (new fixed assets per unit of electricity) and other conditions, in order to infer the annual investment limit and the range of cumulative investment capacity during the '15th Five Year Plan' period. Building on this, a scenario system is established for the transmission and distribution of electricity under the influence of the demand growth rate and distributed power penetration. This system quantifies changes in investment capacity boundaries and the triggering mechanisms of constraints under different scenarios and identifies key factors affecting the investment ceiling through sensitivity analysis.
Fields of Study & Subjects
Electric Power System Optimization
Smart Grid and Power Systems
High-Voltage Power Transmission Systems
Publication details
- Journal / source
- International Conference on Electrical Automation and Artificial Intelligence (ICEAAI)
- Pages
- 119–123
- Publication date
- 16 January 2026
- Language
- EN