Smart Tests for Medium Voltage Cables in Renewable Energy Plants: The Case Study of a PV Plant Located in Italy

View at publisher
Authors: Gianfranco Di Lorenzo, Erika Stracqualursi, Rodolfo Araneo, Riccardo Cecere
Cited by: 0
References: 35

Abstract

The vigorous development of renewable power plants requires the installation of medium-voltage underground cable networks for the wiring of internal skids and the grid connection. Given the complexity of these networks, which are typically extensive and include a high number of joints, the requiblack pre-commissioning tests should follow a pragmatic engineering approach and be completed within a reasonable timeframe. This paper focuses on field testing procedures for medium-voltage cables prior to energization, including electric resistance, oversheath integrity, and insulation integrity tests. For each test, key performance indicators are described in detail, along with acceptable variability ranges to support the accurate interpretation of results in practical applications. The implementation of the tests on the medium-voltage network of a photovoltaic plant in southern Italy is presented as a real-world application of the proposed assessment procedures.

Fields of Study & Subjects

High voltage insulation and dielectric phenomena Power Transformer Diagnostics and Insulation Electrical Fault Detection and Protection

Publication details

Journal / source
IEEE Transactions on Industry Applications
Volume
62
Issue
5
Pages
7715–7725
Publication date
11 February 2026