Research on economic benefits of the Jinghan Canal: a valuation based on real options model

View at publisher Summarise with VIRAT
Authors: Zheng Wang, Bufang Wang, Xuerong He
Cited by: 0
References: 8

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

To address the inherent limitations of the traditional Net Present Value (NPV) method in evaluating the Jinghan Canal project, this study applies real options theory to develop a deferral option (estimated via the Black-Scholes model) and an abandonment option (calculated using the binomial tree model), thereby systematically assessing the project ’ s economic benefits and investment risks. Even with the integration of flexible option strategies—including "delayed decision-making" and "abandonment clauses"—the project fails to meet the threshold of economic feasibility due to two critical structural constraints: substantial initial capital outlays and ongoing rigid maintenance expenditures. Sensitivity analysis further validates the robustness of this conclusion: adjustments to key parameters, including freight volume, maintenance cost ratio, and the risk-free rate, do not reverse the negativity of the total project value. Based on these findings, this paper recommends conducting additional pragmatic feasibility studies and promptly suspending preliminary investment activities to avoid irreversible risk exposure. This research contributes theoretically by applying real options in large-scale water transport infrastructure valuation and practically by providing a scientific basis for project investment planning, offering a replicable framework for quantifying decision flexibility in similar projects.

Fields of Study & Subjects

Capital Investment and Risk Analysis Public-Private Partnership Projects Railways and European Transport Policy

Publication details

Journal / source
International Conference on Engineering Management, Computer Applications, and Supply Chain (EMCAS)
Pages
19–19
Publication date
1 April 2026
Language
EN