Dynamic Programming for Proportionate Flow-Shop Scheduling with Due-Date Assignment

View at publisher
Authors: Lei Ray Pan, Xinyu Sun, Xin-Na Geng
Cited by: 1

Abstract

This paper examines proportionate flow-shop scheduling with general earliness/tardiness costs under two due-date assignment models: the common and slack models. The objective is to determine the optimal job sequence and due dates to minimize a total penalty function that includes earliness and tardiness penalties, the number of early and delayed jobs, and the due-date assignment cost. Several optimal structural properties are derived, and two polynomial-time dynamic programming (DP) algorithms are proposed to solve the problems, with a time complexity of [Formula: see text], and [Formula: see text] is the number of jobs.

Fields of Study & Subjects

Scheduling and Optimization Algorithms Supply Chain and Inventory Management Resource-Constrained Project Scheduling

Publication details

Journal / source
Asia Pacific Journal of Operational Research
Publisher
World Scientific Pub Co Pte Ltd
Publication date
23 January 2026
Language
EN