Hybrid Approaches for Multi-Region Water Pipeline Extension Problems Under Multi-Period Budget Constraints

View at publisher
Authors: Peng-Sheng You
Cited by: 0
References: 25

Abstract

Declining tap water quality and high application fees tied to connection distance reduce user adoption. To stimulate potential users to apply for top water, authorities can address these issues by providing pipeline extensions and subsidies to applicants. This study develops a multi-period mixed-integer nonlinear programming (MINLP) model to optimize tap-water usage under budget constraints. The model incorporates user willingness based on construction distance, alternative water quality, subsidies, and extension nodes under budget limits. Two hybrid algorithms, integrating the Grey Wolf Optimizer (GWO) and Particle Swarm Optimization (PSO) with optimization techniques, are proposed to optimize construction plans and network structures. These deliver feasible solutions for large-scale network design faster than GAMS/CPLEX, which struggles with large-scale problems, achieving 8.51% better user coverage in small-scale instances. The method enhances the design of water distribution networks and supports efficient rural expansion.

Fields of Study & Subjects

Water Systems and Optimization Water resources management and optimization Optimal Power Flow Distribution

Publication details

Journal / source
Journal of Intelligent & Fuzzy Systems
Volume
50
Issue
7
Pages
2340–2364
Publication date
26 January 2026
Language
EN