Determination of the maximum stress of bridge under complicated truck train load

View at publisher
Authors: Weiping Shen, Liu Gang
Cited by: 0

Abstract

This paper deals with the analysis of the maxima stress of bridge under the complicated truck train loading along two-dimension lanes. It is treated as a dynamic programming problem. The concept of “forbidden zone” is introduced. Based on this concept all the constraints of the programming problem are defined. On the basis of the theory of dynamic programming, a algorithm has been designed to find the positions for every trucks in different trains to produce the maximum stress under consideration of a bridge.

Fields of Study & Subjects

Structural Engineering and Materials Analysis Optimization and Mathematical Programming Railway Engineering and Dynamics

Publication details

Journal / source
CRC Press eBooks
Pages
355–360
Publication date
10 February 2026
Language
EN
Document type
Book chapter