Greenland's first hydroelectric power scheme

View at publisher
Authors: K.T. Wæringsaasen, O. Stokkebø
Cited by: 0

Abstract

Based on a policy of shifting from total dependency on oil imports for electricity production, the Home Rule Government of Greenland decided to investigate the possibility of utilising the country’s untouched hydropower resources. As a result of these analyses, it was decided to build Greenland’s first hydropower plant in Buksefjorden, some 60 km southeast of Nuuk. Due for commissioning in October 1993, the plant is designed and constructed by the Nuuk Kraft ANS consortium of which Norconsult International A.S. is a member. The environment in the project area is extremely vulnerable, the logistics difficult and the climatic conditions rough. This has been reflected in the chosen design and construction methods used in the implementation of the Buksefjord Hydropower project. Socioeconomic problems have also been highlighted in the development. This has led to the requirement that local services, subcontractors and manpower should be involved in the project whenever possible.

Fields of Study & Subjects

Hydropower Displacement Environmental Impact Construction Project Management and Performance Renewable energy and sustainable power systems

Publication details

Journal / source
CRC Press eBooks
Pages
743–748
Publication date
11 February 2026
Language
EN
Document type
Book chapter