Underground power house complex of Chamera hydel project

View at publisher
Authors: E. Divatia, Brijendra Sharma, M.R. Bandhyopadhyay, Rajeev Sethi
Cited by: 0

Abstract

Layout of the underground power house complex of the 540 MW Chamera hydroelectric project on river Ravi, India is briefly described. Design of rock support for the two caverns of the complex is discussed. Difficulties experienced during excavation of the caverns are stated. Analysis of, and modifications to the rock support required to match the observed behaviour of the surrounding rock mass, midway through the excavation, are discussed. Results of monitoring of performance during and after excavation are presented.

Fields of Study & Subjects

Geomechanics and Mining Engineering Rock Mechanics and Modeling Tunneling and Rock Mechanics

Publication details

Journal / source
CRC Press eBooks
Pages
69–76
Publication date
11 February 2026
Language
EN
Document type
Book chapter