Reducing uncertainty in underground work for the Snoqualmie Falls Hydroelectric Project

View at publisher
Authors: Kim de Rubertis, Michael J. Haynes, Robert D. King, F. Patrick Seabeck
Cited by: 0

Abstract

The proposed expansion of the Snoqualmie Falls Hydroelectric Project will require excavation of an approximately 22-foot diameter shaft and tunnel in rock. Such excavations often encounter unanticipated geologic or hydrologic conditions which pose significant safety, construction, budget and schedule challenges. Reducing uncertainties and the associated risks for underground work is a goal which must be considered from the earliest stages of design through construction.

Fields of Study & Subjects

Construction Project Management and Performance Tunneling and Rock Mechanics Geotechnical Engineering and Analysis

Publication details

Journal / source
CRC Press eBooks
Pages
109–118
Publication date
11 February 2026
Language
EN
Document type
Book chapter