Underground powerhouse chamber design of ERTAN hydroelectric project

View at publisher
Authors: Li Wo-Zhao
Cited by: 0

Abstract

ERTAN hydroelectric project is located on the lower reaches of Yalong river in the southwest part of China’s Sichuan province and at a distance approximately 46 km from Panzhihua city. The multi-purpose hydroelectric project is developed mainly for power generation. The main features consist of a 240 m high double curvature concrete arch dam, left bank underground powerhouse complex, log passing facilities, right bank spillway tunnel etc. There are 6 sets of units installed in the powerhouse. The capacity is 550MW for each. The design waterhead is 165m, the unit inflow is 370m 3 /s and annual output is 17,000GWh. The left bank underground powerhouse complex is comprised of a power intake penstocks, underground powerhouse, main transformer chamber, tailrace surge chambers. The powerhouse size is 280.3x25.5x65.38m (Length x width x height).

Fields of Study & Subjects

Hydraulic flow and structures Dam Engineering and Safety Civil and Geotechnical Engineering Research

Publication details

Journal / source
CRC Press eBooks
Pages
213–218
Publication date
11 February 2026
Language
EN
Document type
Book chapter