Grouting of leaks in clay liners below bauxite residue deposits

View at publisher
Authors: TR Osborne, K.D. Haselgrove
Cited by: 0

Abstract

This paper describes the methods used to seal leakage through clay liners at the base of bauxite residue impoundments using grouting techniques. Grouting methods have involved the injection of a chemical grout into a basal sand layer at depths of over 20 metres. The works completed to date have resulted in residual leakage in areas grouted being reduced to less than 10% of that evident prior to grouting. Monitor bore observations show that grouting works have reduced the levels of ground water contamination markedly.

Fields of Study & Subjects

Grouting Rheology and Soil Mechanics Bauxite Residue and Utilization Landfill Environmental Impact Studies

Publication details

Journal / source
CRC Press eBooks
Pages
433–440
Publication date
11 February 2026
Language
EN
Document type
Book chapter