Flow towards open excavations with bottom grouted seal
Abstract
In open excavations under groundwater level, control of water inflow is usually achieved by lateral walls, embedded some depth below the excavation level. In pervious soils, grouting under the excavation bottom between the walls is a common method for additional flow control. Under these conditions, the performance of “the solution is usually checked by measuring the amount of water inflow into the excavation and the variations of water levels outside the lateral walls. Both parameters are governed by the permeabilities of the untreated and treated ground. In this paper a solution of the problem is presented. The results are given in non-dimensional charts and applied to an actual case.
Fields of Study & Subjects
Grouting
Rheology
and Soil Mechanics
Geotechnical Engineering and Analysis
Groundwater flow and contamination studies
Publication details
- Journal / source
- CRC Press eBooks
- Pages
- 363–367
- Publication date
- 17 February 2026
- Language
- EN
- Document type
- Book chapter