Monitoring the behaviour of a multi-anchored diaphragm in pyroclastic soil

View at publisher
Authors: G. B. Fenelli, Massimo Ramondini
Cited by: 0

Abstract

During the construction of a shopping centre involving a very large excavation in a homogeneous layer of volcanic sand (pozzolana), 7 r.c. panels were monitored, and displacements at the ground surface just behind the diaphragm wall measured. Monitoring started with the beginning of the excavation and was carried out for two year after the completion of the works. The stress state in the r.c. panels of the wall was deduced from the measurements of horizontal displacements and was compared with the design prevision using the numerical technique of the approximating splines, which worked very well, at least in this case. Pendant la réalisation d’une grande excavation pour la construction d’un centre d’achat dans un dépôt de pouzzolanes, 7 éléments faisant part de la structure de soutènement ont été instrumentés et les déplacements de la surface du sol ont été mesurés. L’auscultation a été conduite pendant deux années dès du depart de l’excavation. Le champs des contraintes dans la structure a été obtenu par l’élaboration des valeurs des déplacements horizontaux et a été comparé avec les valeurs prévues avec une technique numérique d’approximation, qui, dans ce cas, a donné de bons résultats.

Fields of Study & Subjects

Geotechnical Engineering and Analysis Geotechnical Engineering and Soil Mechanics Civil and Geotechnical Engineering Research

Publication details

Journal / source
CRC Press eBooks
Pages
1315–1318
Publication date
12 February 2026
Language
EN