Studies of pile-box foundation interaction under a tall building
Abstract
To study pile-box foundation interaction under tall buildings on Shanghai soft soil, field measurements are reported, for a 24-storey building on box foundation with 233 precast concrete piles 45cm × 45cm × 24.2m. Field measurements include settlement and bearing pressure at different points of the box foundation, and load on head of piles. Measurements were performed throughout the construction period, from foundation pit excavation to completion of the building, lasting about 2 years, and in addition, 4 months thereafter. Computations based on elastic theory and field measurements have been performed for comparison. En vue de l’étude de l’interaction des pieux et de la boite rigide peu profonde sous haut bâtiment a Shanghai, des mesures ont été effectuées sur un bâtirnent de 24 étages, dont la fondation en boite rigide est supporté par 233 pieux de béton armé préfabriques, de 45cm × 45cm × 24.2m. L’ensemble du monitor inclur des mesures des tassements et des charges á differents points de la boite-fondation, du sol sous la boite, et des têtes des pieux. Les observations sont menées sur lénsemble de la durée de la construction, depuis 1’ excavation du sol, jusquá laccoomplissement du bâtirnent, et une prolongation de 4 mois qui suivirent. Des Calculs basés sur la theorie de l’elasticite et les suppositions simplifées ont été réalisé pour comparsion.
Fields of Study & Subjects
Geotechnical Engineering and Soil Mechanics
Geotechnical Engineering and Soil Stabilization
Geotechnical Engineering and Analysis
Publication details
- Journal / source
- CRC Press eBooks
- Pages
- 823–826
- Publication date
- 12 February 2026
- Language
- EN