Performance issues related to geosynthetic liners at Monticello, Utah
Abstract
The U.S. Department of Energy Grand Junction Office is remediating a Comprehensive Environmental Response, Compensation, and Liability Act site that includes cleanup of a former uranium millsite in Monticello, Utah, and placement of more than 2.3 million cubic yards of uranium-contaminated materials in a double-lined repository that was constructed with two composite geosynthetic clay/60-mil high density polyethylene (HDPE) liners. A triple-lined evaporation pond was also constructed with a seven-layer geosynthetic liner system. Liner performance issues are evaluated against the benefits and limitations of a comprehensive construction quality assurance program combined with a postconstruction leak-location survey.
Fields of Study & Subjects
Landfill Environmental Impact Studies
Geotechnical Engineering and Soil Stabilization
Nuclear and radioactivity studies
Publication details
- Journal / source
- CRC Press eBooks
- Pages
- 351–359
- Publication date
- 12 February 2026
- Language
- EN
- Document type
- Book chapter