Installation of a composite slurry wall to contain mine tailings

View at publisher
Authors: Louay M. Owaidat, S.R. Day
Cited by: 0

Abstract

This paper descnbes a case study on the design, construction and performance of an underground barrier intended to contain copper mine leachates in central Arizona The barrier was a composite slurry wall composed of high density polyethylene (HDPE) and soil-bentonite (SB) The purpose of the barrier was to retain low pH (

Fields of Study & Subjects

Landfill Environmental Impact Studies Tailings Management and Properties Grouting Rheology and Soil Mechanics

Publication details

Journal / source
CRC Press eBooks
Pages
421–429
Publication date
12 February 2026
Language
EN
Document type
Book chapter