The implementation and results of an interactive tender process

View at publisher
Authors: Thomas Martin, B P Heer, M. France, M.J. Bell
Cited by: 0

Abstract

This paper presents the philosophy, the development, the implementation process and the results of the interactive tender process (ITP) developed and adopted by ECNZ for the Second Manapouri Tailrace Tunnel Project. It will show how the ITP was used to complement ECNZ’s objectives of developing a set of contract documents which allocated the risks equitably between the contractor and the owner and which minimised the contingent provisions normally incorporated by contractors in their tender pricing. In pursuing these objectives the contract documents incorporated provisions for a Disputes Review Board, provided a Geotechnical Baseline and required bid documents to be escrowed. This paper will discuss the merits of the ITP, describe in detail the ITP process and will comment on its success in achieving ECNZ’s objectives.

Fields of Study & Subjects

Construction Project Management and Performance Structural Engineering and Materials Analysis Tunneling and Rock Mechanics

Publication details

Pages
19–26
Publication date
21 January 2026
Language
EN
Document type
Book chapter