Impact of quarrying coarse gravel from river channel
Abstract
The construction of the Gezhouba Project consumed a total concrete volume of 1 1.04million m 3 , in which the aggregates are sand and gravel from the river bed . To meet the needs of the concrete production and other aspects, a large amount of sand and gravel was quarried in downstream river stretch from Zhenchuanmen to Huyatan during the construction of the Project, with a total quarrying amount of 33million m 3 . As a consequence, the wet season water level has been lowered evidently in the following years. For the discharge of 4 OOO m 3 ∕s, the water level at the Yichang station has dropped, from 39.69 m to 38.66 m. Tlie minimum design navigable water depth of the shiplocks and the downstream approach channels can only meet the current navigation conditions, but the design water depth requirement of 4.5 m.
Fields of Study & Subjects
Hydrology and Sediment Transport Processes
Geology and Environmental Impact Studies
Environmental and Agricultural Sciences
Publication details
- Journal / source
- CRC Press eBooks
- Pages
- 653–658
- Publication date
- 12 February 2026
- Language
- EN
- Document type
- Book chapter