High-speed railway tunnelling in soft granular Frankfurt ground
Abstract
Two examples show the experience with highspeed railway tunnelling in Frankfurt soft ground. At the ’’Frankfurter Kreuz” the railway line Cologne-Frankftirt/Main crosses the highways Frankfurt-Basel and Cologne-Würzburg in a tunnel in near vicinity to the Frankfurt/Main airport. The construction of the tunnel was composed of a two step support. In the first step the crown was excavated under a jet grouted screen. The working face was reinforced with a support core and eight additional horizontal jet grouted columns. In a second step the lower part of the tunnel was excavated. To verify the soil parameters two series of in-situ large scale shear tests were performed. Within the project ’’Frankfurt 21” a new railway tunnel undercrossing the city of Frankfurt/Main is planned. For that various underground tunnels as well as numerous buildings and skyscrapers with their foundations, the river Main and the East docks will be undercrossed.
Fields of Study & Subjects
Geotechnical Engineering and Analysis
Tunneling and Rock Mechanics
Geotechnical Engineering and Underground Structures
Publication details
- Journal / source
- CRC Press eBooks
- Pages
- 117–122
- Publication date
- 24 February 2026
- Language
- EN
- Document type
- Book chapter