Monitoring the second Heinenoord Tunnel and the Botlek Rail Tunnel

View at publisher
Authors: KJ Bakker, F. de Boer, J. B. M. Admiraal
Cited by: 3

Abstract

Two pilot projects for bored tunnelling in soft soil have been undertaken in the Netherlands under authority of the Centre for Underground Construction (COB). A description of the research related to the Second Heinenoord Tunnel and the Botlek Rail Tunnel will be given. The Second Heinenoord Tunnel has completed its boring works, while the boring of the Botlek Rail Tunnel has started in March/April 1999. Experience from the first project is put into use for the development of the latter. Both monitoring schemes have three logical phases: predictions, measuring and evaluation. An overview of all instrumentation and a selection of the results of the Second Heinenoord tunnel are given.

Fields of Study & Subjects

Civil and Geotechnical Engineering Research

Publication details

Journal / source
Geotechnical Aspects of Underground Construction in Soft Ground
Publisher
CRC Press
Pages
191–196
Publication date
24 February 2026
Language
EN
Document type
Book chapter