Tunnel boring machines

View at publisher
Authors: John Johansen, C.F. Mathiesen
Cited by: 0

Abstract

In Norway tunnel driving with tunnel boring machines, TBMs, started some 25 years ago. Ten years later approximately 10% of the tunnels below 30 m 2 in cross-section were driven with TBMs. The peak was reached in 1983 with 30 km of TBM driven tunnels that year. In subsequent years the use of TBM was gradually reduced in favour of conventional methods.

Fields of Study & Subjects

Tunneling and Rock Mechanics Geotechnical and Geomechanical Engineering Diverse Industrial Engineering Technologies

Publication details

Pages
65–66
Publication date
8 January 2026
Language
EN
Document type
Book chapter