TBM Tunnelling in Jointed and Faulted Rock

View at publisher
Authors: Nick Barton
Cited by: 240

Abstract

This practical guide describes the stage-by-stage development of a method for predicting the penetration rate (PR) and the advance rate (AR) for tunnel boring machines based on an expanded version of the Q-value, QTBM. The author analyzes 145 TBM tunnels that total 1,000km in length. He then develops simple formulae to estimate PR and AR from the QTBM value and to back-calculate QTBM from performance data. The book quantitatively explains actual advance rates as high as five m/hr for one day or as low as 0.005 m/hr for several months. It also covers logging methods, empirical TBM tunnel support design, and numerical verification of support.

Fields of Study & Subjects

Tunneling and Rock Mechanics Advanced materials and composites Drilling and Well Engineering

Publication details

Publisher
CRC Press
Publication date
19 January 2026
Language
EN
Document type
Book