Rapid development of CFST arch bridges in China

View at publisher
Authors: Shuixing Zhou, Shanlin Chen
Cited by: 0

Abstract

Since 1990, about 200 CFST arch bridges have been built all over China. The developing history of CFST arch bridges is divided into two distinctive stages according to the structural evolution in this paper. The advantages and disadvantages of design and construction were introduced separately in the different stages. The design defects and construction problems of CFST arch bridges, such as inappropriately pumped concrete causing weak bond between the steel tube wall and the filling concrete, the lack of effective post-grouting measures, the dangerous stress fatigue in the CFST arch ribs and short suspenders caused by repeated service loads, are stressed. The three typical CFST arch bridges are introduced in this paper.

Fields of Study & Subjects

Structural Load-Bearing Analysis Structural Engineering and Materials Analysis Civil and Structural Engineering Research

Publication details

Journal / source
CRC Press eBooks
Pages
915–920
Publication date
12 February 2026
Language
EN
Document type
Book chapter