Multiple resource constrained underground mine scheduling
Abstract
Network theory and heuristics seem to be the most promising techniques for solving the production scheduling problem in underground mines. A heuristic model has been developed based upon scheduling rules commonly used by mining engineers. It provides the engineer with a powerful tool for evaluating alternate schedules. The only requirement for the program is that the section definitions are available in a machine readable format.
Fields of Study & Subjects
Mining Techniques and Economics
Scheduling and Optimization Algorithms
Resource-Constrained Project Scheduling
Publication details
- Journal / source
- CRC Press eBooks
- Pages
- 49–58
- Publication date
- 13 February 2026
- Language
- EN
- Document type
- Book chapter