Special foundation of new buildings in Nové Sady Street in Brno

Read full text
Authors: Petr Svoboda
Cited by: 0

Abstract

The construction of the TITANIUM building was started in 2008 near the main railway station in Brno, along the left side of Nové Sady Street. This was followed by the southern extension and expansion of the IN SADY building, then the northward extension of the TITANIUM X and CENTROPOLIS buildings. Various special foundation methods were used in the construction of the building pits and the actual foundation of the buildings. Responses to the realistic form of neogenic clay were also important.

Fields of Study & Subjects

Geotechnical Engineering and Soil Mechanics Civil and Geotechnical Engineering Research Geotechnical Engineering and Analysis

Publication details

Journal / source
Acta Polytechnica CTU Proceedings
Volume
56
Pages
32–36
Publication date
20 February 2026
Language
EN