ASCC PS #50: Facilities for Curing of Concrete Test Specimens in the Field

View at publisher Summarise with VIRAT
Cited by: 0
References: 3

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The contractor who is responsible for the site, typically the general or prime contractor, is responsible for: 1) secure location; 2) water sources; and 3) electrical power. The contractor requirement to meet ACI SPEC-301-20 requirements is supported by ACI PRC-132-2. ACI PRC-132-24 states the “testing agency has the responsibility to provide the means and methods for initial curing unless that responsibility has been assigned to another party in the contract documents.”

Fields of Study & Subjects

Civil and Structural Engineering Research Concrete Properties and Behavior Concrete and Cement Materials Research

Publication details

Journal / source
ACI Concrete International
Volume
48
Issue
4
Publication date
1 April 2026
Language
EN