Development of a support vector machine-based predictive model for bored pile productivity in residential construction projects in Iraq

Read full text
Authors: Laith N. Ali, Saja Hadi Raheem Al-Dhamad, Faiq M. S. Al-Zwainy, Rana I. K. Zaki, Ibrahim Farouq Varouqa, Salman Dawood Salman Al-Dulaimi, Aseel H. Obaid, Mazin M. Sarhan, Albert P.C. Chan, Rana Ahmad Maya, Gasim Hayder
Cited by: 1
References: 30

Abstract

Accurate prediction of construction productivity remains a critical challenge in the civil engineering sector, particularly for deep foundation works such as bored piles in residential projects. This study proposes a data-driven predictive model based on Support Vector Machine (SVM) to estimate the productivity of bored piles in high-rise residential construction projects in Iraq. Real-world data were collected from the Iraq Gate Residential Complex and used to train and validate the model. Key influencing factors included pile geometry, soil type, equipment specifications, crew size, and working hours. The model achieved a mean prediction accuracy of 99.89% and a correlation coefficient (R) of 97.02%, demonstrating superior performance over conventional estimation methods. These findings highlight the practical value of machine learning approaches in enhancing resource planning and decision-making during early project phases. The proposed SVM-based model can support contractors and engineers in forecasting performance outcomes and minimizing scheduling uncertainties in similar construction settings.

Fields of Study & Subjects

Construction Project Management and Performance BIM and Construction Integration Construction Engineering and Safety

Publication details

Journal / source
DYNA
Publisher
Universidad Nacional de Colombia
Volume
93
Issue
240
Pages
81–88
Publication date
11 February 2026
Language
EN