PERFORMANCE MEASUREMENT IN LVHM MANUFACTURING: KPIS, TECHNOLOGIES, AND STARTUP GAPS

Read full text Summarise with VIRAT
Authors: Wickramanayake Pathirannahalage Sajith Dilshan, Andrea Emese Matkó, Domícián Máté, Jolita Vveinhardt
Cited by: 0
References: 45

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The high degree of product variability and the ever-changing demands of customers make performance monitoring a constant struggle in low-volume high-mix (LVHM) production settings. This research provides a systematic literature review in accordance with PRISMA principles, examining 42 peer-reviewed papers (2021–2025) sourced from Scopus and Web of Science. Research has indicated that lead time and makespan are the predominant performance indicators. Moreover, digital twins, reinforcement learning, and discrete-event simulation are being increasingly used to increase scheduling efficiency and cost effectiveness. A bibliometric study using R Studio indicates a significant focus on job shop scheduling and AI-driven optimisation. Critically, there is a substantial gap in the literature, as no study explicitly addresses startup LVHM manufacturing. This review lays the foundation for performance frameworks specifically designed for LVHM manufacturers in the early stages of development.

Fields of Study & Subjects

Scheduling and Optimization Algorithms Management and Optimization Techniques Digital Transformation in Industry

Publication details

Journal / source
Management Theory and Studies for Rural Business and Infrastructure Development
Volume
48
Issue
1
Pages
51–66
Publication date
2 April 2026
Language
EN