Study 2: Alternate Measure of Accuracy/Reliability/Stability

Read full text
Authors: John Protzko
Cited by: 0

Abstract

Here we use the data generating procedures in Study 1 to see how the correlation coefficient are handled by Receiver Operating Curves (ROC) using strict and lenient definitions of ‘correct’. For reliability, we test the repeatability coefficient and the IntraClass Coefficient (ICC). For stability we look at both a change score model, as well as a Univariate Latent Change Score model.

Fields of Study & Subjects

Psychometric Methodologies and Testing Reliability and Agreement in Measurement Meta-analysis and systematic reviews

Publication details

Journal / source
Open Science Framework
Publication date
1 January 2026